Skip to content
SafetyCulture
Template

Category 3 Cooker 1 Start-up Checklist

by Darren Challinor, from the Community

Downloads: 20+

This start-up checklist guides operators through preparing Category 3 Cooker 1 and associated plant for production. It covers safety confirmations, boiler pressure checks, steam valve settings, vacuum line readiness, and tallow line configuration. Steps include clearing condensate, setting modulating steam, priming pumps, selecting raw material sections, and filling the cooker feed bin. It details bringing ancillary equipment online, including decanters, shakers, presses, sedimenter, conveyors, and discharge controls, with sign-offs for operators, runners, and managers. The checklist emphasizes controlled ramp-up, monitoring temperatures and amps, and ensuring lines and valves are correctly positioned for a safe, efficient start.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.