Azimut Yachts Pre Delivery Inspection Checklist
by Matthew Hehn, from the Community
This Azimut Yachts pre delivery inspection checklist helps surveyors and dealers confirm each vessel meets contract specifications before handover. It guides checks across hull, deck, flybridge, engine room, electrical and hydraulic systems, and accommodations. It includes sea trial measurements, leakage testing, and verification of serial numbers and installed options. The form supports documenting defects, remarks, and signatures for surveyor, delivery manager, and quality manager, ensuring a complete quality and safety record.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
