Skip to content
SafetyCulture
Template

A016-23 Gemba Walk Checklist

by Roland Suranyi, from the Community

0
Get this template

Use this A016-23 Gemba Walk checklist to systematically observe work on the shop floor and drive continuous improvement. Review standard work documentation and adherence, clarify process inputs and sourcing, align tasks with business objectives, and confirm KPIs for success. Identify quality challenges, bottlenecks, and unavoidable waste. Verify access to tools and materials, define contingencies for shortages, and check PPE compliance. Capture when standard work last changed, how improvements are proposed, and any unasked issues. Ideal for lean manufacturing teams to surface insights and actions during daily walks.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

A016-23 Gemba Walk Checklist for Lean Manufacturing | Free Template