Skip to content
SafetyCulture
Template

BAM and 4-Stage Asbestos Clearance Audit Checklist

by John Conroy, from the Community

Downloads: 10+
Get this template

This asbestos compliance audit checklist supports Background Air Monitoring (BAM) and the full four-stage clearance process in line with HSG248 and HSG247. It guides pre-start health and safety checks, analyst competence and training (P403, P404, RSPH), PPE and RPE selection and fit, and RAMS verification. It covers air monitoring setup, pump flow and calibration, temperature/pressure logging, lab procedures, microscope setup, WHO counting rules, fibre calculations, and TWA. The four stages include enclosure integrity, thorough visual inspection, active disturbance with correct sample numbers, and final reassurance testing. It also addresses decontamination and DCU clearance, waste control, documentation, QC review, and reporting requirements.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.