Use this IoT post-install site audit to verify that MCP and CCP panels are correctly positioned, cables are routed and labelled, glands are sealed, and work areas are left clean. Capture photos of installed devices, confirm control sockets, door contacts, cellar cooler solenoid control and metering, and touchscreens meet spec. Validate LoRaWAN panels, room temperature sensors, Krypton bottle coolers, external lighting controllers, and fan extract operation. Record team details and dates, note faults, and complete GM and auditor sign-off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
