Skip to content
SafetyCulture
Template

Argos P0 Shared Infrastructure Sign Off

by felix moshi, from the Community

Downloads: 10+
Get this template

The Argos P0 Shared Infrastructure Sign Off checklist helps teams confirm store IT infrastructure readiness. It covers locating and checking hardware, confirming the router is installed and active, cabinet space and patch mapping, and installation of servers and NAS. Verify UPS protected power, network activity lights, and capture serial numbers. Log any DOA hardware or site issues, attach photos, and ensure the site is left clean. Includes sign off fields for Sainsbury's and J Brand engineers.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.