Use this A1 End of Day Report EODR to capture a complete summary of ULC site work. Record engineer name, location, work completed, tasks left, ground level works, materials missing, access or parking notes, and reasons for delay. Include walk away photos to show the site is safe and secure, note times the site was locked and unlocked, log good call or close call observations, and attach pictures and partial HOP. Ideal for ICT field teams to standardize daily handover.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
