Use this pre-monsoon site risk assessment checklist to prepare facilities for heavy rains and humidity. Review drainage and leakages, remove standing water, and level external areas to prevent water stagnation. Check air curtains, doors, and window screens to keep flies out, and ensure bins, waste areas, and surrounding vegetation are maintained to reduce infestation risks. Document hazards, rate risks, and assign control measures to improve safety and hygiene before the monsoon.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
