Winding Creek No 3 Dam Post earthquake Inspection
by Catchment Operations, from the Community
This post earthquake inspection checklist helps local government or utilities teams assess the Winding Creek No 3 detention dam on Hillsborough Road after seismic events. Inspect main embankments, earth embankments to rip rap, gabion entrainment walls, culvert entries and handrails, outlet works and trash racks, rip rap protection, and dam storage areas. Record signs of cracking, slumping, vegetation encroachment, debris and blockages, seepage, and other safety issues. Capture observations, location, severity, and priority to plan maintenance and ensure dam safety.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
