Wallbox Commissioning Report for DCF1, DCF2 & DCF4
by Emma Selway, from the Community
This commissioning checklist guides technicians through safe startup and validation of Wallbox Supernova DC fast chargers across DCF1, DCF2, and DCF4 models. It covers PPE and site safety review, mechanical and electrical inspections, power-up and voltage checks, software updates, HMI and RFID verification, lighting and cooling checks, meter and isometer configuration, POS setup, telemetry and OCPP connectivity, signal strength capture, EV charge tests (including split charge where applicable), photo documentation, backend validation, and acceptance signatures.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.