Skip to content
SafetyCulture
Template

Uptower Repair Report

by Gabriel Fradella, from the Community

0
Get this template

Use this uptower repair report to document wind turbine maintenance and repairs. Capture site and customer details, WTG number, manufacturer, model, and serials. Record scope of work, pre-repair conditions, and photo evidence. Track disassembly and assembly with comments, list damaged and new parts with serial numbers, and complete a thorough post repair checklist including torque to spec, oil line integrity, cleanliness, rotor lock, leak check, and turbine walkaround. Log calibrated tooling, models, and calibration dates, then finalize with a job summary and technician signatures.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.