TOR for Field Verification Checklist
by Whibeslassie Tesfaslassie, from the Community
This Terms of Reference checklist supports field verification of water supply schemes. It captures project location details (site name, Wereda, Kushet, Tabia), GPS and well ID, and notes project type and construction or rehabilitation status. Inspect security and operations (fencing, locks, downtime, breakdown type, current beneficiaries). Evaluate institutional readiness and WASHCO governance, including presence of a guard, bank account and deposits, user fees, bylaws, member training, and gender composition. Record water quality observations (taste, color, issues) and sanitation conditions such as drainage and standing water. Document any supplies provided to the community and attach photos including wide views and plaques.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
