TNZ 2 Ship Discharge Terminal End Checklist
by Terminals NZ Ltd, from the Community
This TNZ 2 checklist supports safe ship-to-terminal discharge of bulk fuel. It covers API and AS1940 compliance, tank gauging and monitoring (Varec and SAAB), PV and overflow venting, high and high-high level alarms, bund integrity, ignition-free zones, vapor control, and single-tank discharge policy. It guides operators to verify dips, monitor pressures (2 bar initial, 7 bar maximum), conduct 30-minute manual inspections, manage discharge rates, and maintain certificates and records for secure terminal operations.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
