Skip to content
SafetyCulture
Template

TNZ 2 Ship Discharge Terminal End Checklist

by Terminals NZ Ltd, from the Community

Downloads: 0
Get this template

This TNZ 2 checklist supports safe ship-to-terminal discharge of bulk fuel. It covers API and AS1940 compliance, tank gauging and monitoring (Varec and SAAB), PV and overflow venting, high and high-high level alarms, bund integrity, ignition-free zones, vapor control, and single-tank discharge policy. It guides operators to verify dips, monitor pressures (2 bar initial, 7 bar maximum), conduct 30-minute manual inspections, manage discharge rates, and maintain certificates and records for secure terminal operations.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.