Skip to content
SafetyCulture
Template

SSEG Commissioning Report Checklist

by Ryan van Deventer, from the Community

Downloads: 0
Get this template

This SSEG commissioning report template helps teams verify grid-tied or hybrid solar PV installations before handover. It covers array inspection, DC design and labeling, earthing and bonding, environmental and roof access controls, AC electrical works, surge protection, and signage. Inverter commissioning includes model and firmware details, wiring checks, torqueing, MODBUS setup, voltage measurements, NRS 097 compliance, and loss-of-mains testing. Record MPPT and string test data, insulation resistance, and operational values. Commission revenue meters and plant controllers, configure routers and data loggers, and confirm monitoring connectivity. Attach notes and evidence to ensure safety, performance, and compliance.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.