Quality Inspection and Progress Report for Network Projects
by Deirdre de Swardt, from the Community
This inspection checklist supports quality control and progress tracking across water and civil network projects. It covers stakeholder communications and disruption notices, site setup with contract specifications and for-construction drawings, and project management plans. It guides surveys and records including DBYD plans, hold points, photos, and asset data, plus as-constructed markups and survey checks. Technical sections include pipeline construction to contract and manufacturer specifications, bedding and backfill, restoration, welded joint logging, steel reinforcement, concrete work, pressure testing with NATA certification, and water quality protocols such as flushing, chlorination, and bacterial testing. Capture findings, assign corrective actions, and document completion with signatures.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
