Skip to content
SafetyCulture
Template

PV Strings Cold Commissioning Checklist

by Ricky Jones, from the Community

Downloads: 0
Get this template

This PV strings cold commissioning checklist helps teams verify solar PV string readiness before energization. Document project and site details, test equipment, and confirm compliance with design. Inspect labeling at junction box or inverter, check connector specifications and installation, and perform key electrical tests including insulation resistance (Riso > 1 MOhm), polarity, open-circuit voltage (Voc), and short-circuit current (Isc). Capture findings, re-inspections, reservations and notes, and complete final assessment and acceptance with contractor and client signatures.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.