This annual preventive maintenance checklist helps technicians maintain submersible water pumps used in municipal and facility systems. It guides teams to prepare tools (electrician toolbox, clamp meter, megger), follow safety and lockout/tagout procedures, review manufacturer instructions, and document findings. Core steps include inspecting wiring for damage, measuring current and voltage against nameplate values, performing motor insulation (megger) tests, and verifying pump capacity for recirculation and jockey pumps. Use it to record defects, results, and time spent, supporting reliability, safety, and compliance.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
