This pre start survey template helps plan electrical utility connection projects before teams or subcontractors attend site. Record site and client details, confirm handover and scope, and set proposed start dates. Capture induction and authority meeting needs, site activity and work time restrictions, and excavation requirements and methods. Define trench specifications, lines and levels, hospital proximity, and welfare facilities. Document DNO and point of connection, substation type and location, base details, feeder pillar position, trench depths, backfill materials, cable types and routes, earthing, ducting, and marker tape. Note disconnections, specialist equipment, cable pull lengths and crew, plant, traffic sensitivity, notices, storage, excavation routes, and reinstatement.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
