This post-solar site audit template helps verify safety, quality, and compliance of photovoltaic installations after commissioning. Capture project details and generation metrics, then assess labeling, inverter installation, cable sizing, device selection, and isolation. Check roof cavity conduit routing and support, rooftop wiring protection, MC4 compatibility, earthing of rails, and panel exclusion zones. Record MPPT voltages, confirm adherence to AS/NZS 5033:2021 and AS/NZS 3000:2018, and attach photos of the inverter and switchboard to document findings.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
