Use this post service audit checklist to verify completed gas service installations. Sections cover site details, location, project name and number, meter box installation, ECV placement and access, on off tape legibility, yellow label completion, bonnet fitting and standpipe sleeving, and house or factory entry installation. Capture photo evidence, add comments, and obtain sign off with signature, date, and time to document quality and compliance.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
