Piping Pre-commissioning Checklist

by Peter Nwachukwu, from the Community

Downloads: 0

Use this checklist to guide piping and pipeline pre-commissioning activities from dry and wet commissioning through final handover. It covers flooding spread set-up, pig valve launching sequences, and pipeline flooding, pigging, gauging, and chemical injection. Steps include JSA and permit checks, equipment readiness and valve positions, communications with dive teams, pump and recorder function tests, logging and sign-offs, and depressurization procedures for safe, compliant operations.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.