Use this field inspection checklist to manage critical risk from energy released during live line works. It covers planning and hazard identification including task risk assessment, emergency and isolation plans, brownfield as-built data, and locating underground services. Controls include ISSoW permits, boundary isolations, vacuum excavation and slot trenching, competency checks, non mechanical digging within 500 mm, gas monitor bump tests, barricading and signage, and emergency readiness. Learning captures as-built surveys and GIS updates.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
