Skip to content
SafetyCulture
Template

LEG BOP Inspection 2021 Nipple Up Checklist

by Daniel Garcia, from the Community

Downloads: 0

This BOP inspection checklist is designed for use after nipple up to verify proper installation and readiness of well control equipment. Inspectors record site, rig number, personnel, and conduct a detailed review of the BOP stack, downstream plumbing, choke manifold, HCR valve, gauges, accumulator system, flare stack and panic lines, kill and choke lines, coflex hoses, and flow line hardware. The form references API STD 53 requirements, confirms certifications and function tests, checks pressure and labeling, and captures comments and signatures to document compliance and operational safety.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

LEG BOP Inspection Checklist 2021 | Nipple Up Sheet | Free Template