Use this Kdec V3.2 Solar Commissioning Check Off checklist to guide safe, compliant PV system handover. It covers module and inverter details, string configuration, tilt and orientation, frame certification, sealing of roof penetrations, wiring support and loss limits, isolators at the array and inverter, and an AC main switch. It includes continuity and insulation resistance tests, open circuit voltage and short circuit current checks for each string, and verification of inverter shutdown and reconnection times for anti-islanding. The template also records CEC installer and designer details, license numbers, and requires all mandatory solar safety labels to be affixed.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
