Use this internal work completion checklist to document solar and electrical installation work from start to finish. Capture site details, start and completion dates, and who performed the work. Record battery and inverter serial numbers, take required photos of meters, DC cable routes, roof cable entry, scaffolding tags, and app connection. Note any deviations to design, attach signed materials checklists and completed DC test sheets, and verify smoke detection. Confirm the system is operating correctly, the app is set up, and provide visual proof. Gather client presence and satisfaction, obtain client signatures, and complete installer sign-off to finalize handover and ensure quality and safety compliance.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
