Use this internal work completion checklist to document solar and electrical installation work from start to finish. Capture site details, start and completion dates, and who performed the work. Record battery and inverter serial numbers, take required photos of meters, DC cable routes, roof cable entry, scaffolding tags, and app connection. Note any deviations to design, attach signed materials checklists and completed DC test sheets, and verify smoke detection. Confirm the system is operating correctly, the app is set up, and provide visual proof. Gather client presence and satisfaction, obtain client signatures, and complete installer sign-off to finalize handover and ensure quality and safety compliance.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
