Skip to content
SafetyCulture
Template

Internal Work Completion Checklist

by Callum Conroy, from the Community

Downloads: 0
Get this template

Use this internal work completion checklist to document solar and electrical installation work from start to finish. Capture site details, start and completion dates, and who performed the work. Record battery and inverter serial numbers, take required photos of meters, DC cable routes, roof cable entry, scaffolding tags, and app connection. Note any deviations to design, attach signed materials checklists and completed DC test sheets, and verify smoke detection. Confirm the system is operating correctly, the app is set up, and provide visual proof. Gather client presence and satisfaction, obtain client signatures, and complete installer sign-off to finalize handover and ensure quality and safety compliance.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

Internal Work Completion Checklist | SafetyCulture | Free Template