Skip to content
SafetyCulture
Template

DN-14b Mains Jointing: Butt Fusion to 355mm

by Alan Milford, from the Community

0
Get this template

This DN-14b checklist outlines the full procedure for gas mains jointing using fully automatic butt fusion equipment up to and including 355 mm PE pipe. It covers site preparation and safety, machine condition and power checks, cleaning and trimming, alignment verification, heater plate temperature control, and the automated fusion and cooling cycles. Quality assurance steps include dummy joints to clean the heater plate, bead inspection and measurement, bend-back testing, and documentation of each weld via printout or electronic record. Guidance is provided for when to repeat heater cleaning and for corrective action on faulty joints, with final assessor sign-off.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

DN-14b Mains Jointing: Butt Fusion Procedures to 355mm | Free Template