This checklist guides field teams through the installation and verification of pipeline marker posts. Capture site details, date, preparer and location. Record the marker post type and unique ID, confirm concrete face plate renewal where required, and verify post placement above the pipeline or within three meters with landowner agreement. Specify rural or urban setting, confirm M4 posts are installed at a depth of 0.5 meters, check that no dig labels are positioned at eye level, and collect installer signatures for traceability.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
