This watermain testing checklist guides site teams through validation of new or modified mains. Record project details, contractor information, site conditions, and the presence of a water authority validation officer. Perform and document swabbing, confirm backflow protection, and flush lines until clear. Conduct pressure testing on potable and recycled lines, capture start and finish times, and verify no pressure loss over the test period. Log gauge serial numbers and calibration dates, and document whether mains are held at pressure overnight with measured make up volumes. Assess results against defined volume change pass criteria. Conclude with auditor comments, photo records, and confirmation that corrective actions are completed.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
