EE Pillar T3, 4 and 6 Termination Checklist
by Jacquie Fisher, from the Community
This checklist guides Accredited Service Providers through safe, compliant low voltage EE pillar terminations for T3, 4 and 6. It covers site preparation, boundary peg location, cable backfilling with sand, correct cable lay without crossing, and base setting to ground level. Steps include verifying neutral termination on the road side, confirming phase sequence neutral red white blue, torquing bolts to instructions, ensuring no exposed conductors, and documenting the completed termination with photos. It also includes street light and LV pit connections, neutral identification tagging, time and date capture, and final sign off.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.