This ash dam inspection record helps teams at Callide Ash Dam B document key operational checks. Capture date and weather, assign inspectors, and record dam storage levels in metres AHD. Inspect the crest for cracking, settlement, drainage, signage, and vegetation. Review the downstream face for erosion, slumps, inappropriate vegetation, animal activity, and signs of seepage, confirming markers and drainage points are clear. Assess the spillway for concrete distress, obstructions, booms, and channel vegetation. Log seepage observations and V-notch weir readings (including pump status and turbidity) across V1–V4, with notes for decommissioned or additional points. Conclude with incident notes and signatures, ensuring reports are saved per site procedures.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
