This AECI/AECC dielectric testing checklist supports utility crews in documenting high-voltage inspections of aerial devices and insulating liners. Record key equipment details (manufacturer, unit, model, serial, department), environmental conditions (humidity), and test data, including upper boom and lower insert tests at 56 kV with leakage in microamps. Capture bucket liner tests at 100 kV, apply pass or fail outcomes, note decal application, and add comments. The form includes sections for tester and operator signatures, date and time of testing, and crew members. Use it to standardize compliance, traceability, and safety across electrical utility fleets.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
