This mechanical completion inspection checklist supports EPC and commissioning teams building utility-scale or commercial solar PV sites. It covers module and array verification, racking and pile foundations, conduit and wire management, inverter and disconnect installation, DC and low-voltage cable checks, DC combiner and disconnect boxes, metal-enclosed busways, power transformers and testing, medium-voltage cable install and VLF testing, grounding system inspection and testing, ground fault protection, overcurrent protection devices, surge arresters, switches, reclosers and sectionalizers, protective relays, meters and instrument transformers. It also includes BESS coordination, fiber/data cabling tests, and weather monitoring equipment validation. References include NETA-ATS and IEC 62446-1, with emphasis on labeling, torque marks, photos, and compliance with NEC.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
