Skip to content
SafetyCulture
Template

WUC Internal Waterproofing Checklist

by Ganesan Gopal, from the Community

Downloads: 0
Get this template

This internal waterproofing checklist helps construction teams verify key steps before and after membrane installation. It covers plumbing rough in, surface preparation free of contaminants, use of approved products such as WPA, Gripset, or Ardex, and compliance with Australian Standards. It guides detailing of pipe penetrations and junctions with polyurethane coves, required waterproofing heights in showers and other areas, coat thickness per application at 0.4 to 0.5 mm, and number of coats per manufacturer guidelines. It includes barricading and protection during curing, confirmation that membranes have cured before follow on works or screeding, and screed falls set to 1 to 100. The template supports photo evidence, comments, and supervisor signature with date.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .