This quality assurance checklist guides inspections for balcony CP board and cladding installation. It covers steel plenum installation, fire mastic and water sealing, and waterproof integrity. Verify top hats are correctly specified, aligned, fixed to SFS studs, and level. Check helping hand brackets, fixings, and slot positions meet design. Inspect vertical and horizontal fire barriers per FSI specification, retaining brackets, compression, and foil tape application. Review visqueen selection, fixing, and condition. Confirm insulation specification, tight fit, fixings, and condition. Validate horizontal and vertical rails alignment and datum. Finally, confirm Y wall board type, fixing counts, and panel condition, with photos, dates, and sign offs.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
