This start work checklist guides safe water valve changeover and replacement in buildings. It covers coordination with the building manager, tenant notification, and isolating main water lines. The procedure prompts verification of shutdown, SWMS acknowledgment for hand tools, ladders, and plumbing installations, and the use of appropriate PPE. Capture photos of the existing valve, confirm compatibility and size of the replacement, record the new valve’s serial number, and manage leaks with drop sheets and buckets. Finish with site housekeeping, notes, and a clear handover.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
