Use this Vaux Site Handover Inspection Form Rev 2 to manage pre work checks and final QA on construction projects. The checklist covers design and materials approval, competency, risk assessments and method statements, temporary works and preceding works handover. Record roofing system installation including VCL, insulation, membranes and leak testing, verify decking and cladding works with fixings and fire barriers, and capture photographic evidence of critical interfaces. Track snagging to closure, confirm areas are clean and ready, and obtain signatures from the Certa Manager and main contractor for handover.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
