Skip to content
SafetyCulture
Template

Work Inspection Sheet for Metal Through-Fix Roofing

by Olivia Philpotts, from the Community

Downloads: 10+
Get this template

A detailed work inspection checklist for metal built-up through-fix roofing systems used on construction projects. The template covers pre-start controls, approved personnel access, fixings at correct centres, liner sheet installation and joint sealing, continuous vapour checks, zed spacers and ferrules, insulation quilts and optional breather membranes, side and end laps with sealant tape, rooflight fixings, watertightness testing with an air suction gun, flashings, gutters and penetrations, corrugation fillers, treatment of cut ends, safe fixing practice, and gutter liner continuity. Includes fields for project details, references, supporting documentation, comments, and final inspection sign-off.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.