Use this UHL pre-slab pour quality check to confirm foundation readiness before concrete. Capture site details and verify sighting pegs, straight and true boxing, waterproofing installation, service locations, underslab drainage and plumbing (temporarily sealed), and correct DPM placement. Check brick and garage door rebates and thickenings are in the right locations. Record documentation including certificates, engineer and geotech notes, council inspections or waivers, drainage and plumbing inspections, records of works, and any post-consent changes.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
