Skip to content
SafetyCulture
Template

UFI Photo Evidence Mid and Post Install and Ventilation

by IT Dept, from the Community

Downloads: 0

Use this checklist to capture required photo evidence during mid and post installation of underfloor insulation and ventilation work on park homes. Document pre works conditions, UFI progress, finished areas, and additional works. Verify background ventilation with skirt vents, door undercuts of minimum 7600 mm2, and vents or window trickle vents in habitable rooms. Record extractor fans in all wet rooms and confirm combustion ventilation with core vents where gas fires or log burners are present. Complete final checks for leaks, customer sign off, and DOCC form. Attach clear labeled photos for compliance and quality assurance.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.