Use this pre-check to confirm site readiness before roofing installation. Record the builder and site address, capture a photo of the site sign, and verify key prerequisites including fascia and gutter installation, temporary or permanent props, guard rails, and completed fencing. Check bin space for waste, water availability, and sufficient room for tiles at the front and back. Confirm power access, document any site problems with photos, and take a final photo of site gates closed after inspection. Finish with the site supervisor's signature and date.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .