Tilt Panel Checklist for Tilt-Up Concrete
by Patrick Marchman, from the Community
This tilt panel checklist guides crews through tilt-up and precast concrete work from planning to post-erection. It covers training and accreditation, work zone barricades, review of engineered shop drawings, safe storage and JSA, crane and rigging requirements, OSHA 1926.1419–1427 verifications, lifting docs, fall zones and bracing, traffic management, and final tie-in. Includes post-erection brace checks, inspection certificates, engineer sign-off, and a corrective actions log with risk ratings and completion tracking.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
