Skip to content
SafetyCulture
Template

Supervisor Pre-Lockup Checklist

by Luke Pearce, from the Community

0
Get this template

This supervisor pre-lockup checklist helps builders verify critical items before the lockup stage. Review site establishment, frame alignment and fixings, cornice lines, openings, and garage door blocks. Confirm correct installation of windows and doors, cavity frames, and wall wrap. Mark slab details including floor coverings, door swings, returns, and control joints. Check electrical, plumbing, gas, ventilation, and in-wall services for placement, fixing, and leaks. Note tiling, joinery, and benchtop specifications. Inspect external elements such as cladding, flashing, gutters, and control joints. Record issues, coordinate subcontractor actions, and document pass/fail with notes and sign-off.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.