Skip to content
SafetyCulture
Template

Pre-Start Dynamic Risk Assessment and SSOW

by Bryony Coram, from the Community

0
Get this template

This pre-start dynamic risk assessment and safe system of work checklist helps teams verify site readiness for short duration, low hazard tasks. It guides users through Stop, Think, Act steps, confirming signage, permits, PPE, tool and access equipment condition, and competence. It lists common hazards such as working at height, vehicles, electricity, asbestos, dust, noise, vibration and weather, and prompts controls, COSHH references and additional measures. Includes a method statement section and workforce briefing sign off to ensure safe, compliant work starts.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.