Conduct thorough pre-use checks for Mega Step podium steps with this SMS 620 inspection template designed for the Wembley site. Verify chain hook locks, platform and treads, pivot bolts, handrails, bracing, and center locking mechanisms. Inspect welds and tubes for damage, confirm instruction labels are fixed and legible, check level, wheels, and feet condition, and ensure the scaff tag is signed within 7 days by a PASMA trained person. Record subcontractor, date, location, serial numbers, add PASMA certificate, capture photos, note defects and comments, and sign off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
