Skip to content
SafetyCulture
Template

RESCo Material Securement End of Day Checklist

by Terrence Haynes, from the Community

Downloads: 20+
Get this template

Use this end-of-day material securement checklist from RESCo Energy Inc. to verify the site trailer is locked, windows closed, and power disconnected; confirm scaffolds are tagged, secured, and clear of materials; complete housekeeping by removing debris, packing and crating materials, and tying off cut-offs; and secure panels, racking, cable trays, wiring, plywood, job boxes, tools, and equipment. Document any corrective actions, note weather, and sign off before leaving site to maintain safety, prevent loss, and meet site compliance.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .