Use this QA/QC checklist to assess SFS framing and Siniat Weather Defence sheathing at parapets. It covers setting out to gridlines and datum, deflection allowances and brackets, track fixings to concrete (TAPCON anchors), stud spacing and fixings, board type and screw spacing, joint sealing, wind posts, and final signoff by contractor and client. Ideal for site inspections to verify workmanship and compliance on façade and parapet installations.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
