Ensure quality and compliance before tack and close-up on timber frame residential builds. This checklist covers party wall rendering and acoustic insulation, sealing mortar joints, gaps and clearances around stairs, intumescent coating on steel, joist straps and strongbacks, truss bracing, airtightness tape on perimeters, penetrations and reveals, insulation and VCL placement, fire stopping of service penetrations, plumbing and waste pipe support, CMEV ducting protection, socket box setouts, ESB cable conduit and grommets, and correct cable routing. Use it to document findings, assign actions, and standardize inspections on site.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
