Skip to content
SafetyCulture
Template

Post Works Assurance Checklist - Gable

by building team south, from the Community

0
Get this template

Use this Post Works Assurance Checklist to confirm quality, safety, and documentation after installing gable-mounted digital screens or panels. Verify removal of legacy panels and fixings, finish quality of steelwork and fascia/trim, tile alignment, pull tests, screen condition, and placement to drawings. Capture photos and complete handover records, including annotated as-builts, SATs, inductions, RAMS briefings, permits, and equipment checks. Validate PPE, barriers, signage, lifting gear (LOLER), harness inspections, and site cleanliness before sign-off.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.