This post installation checklist helps contractors verify boiler installations are safe, compliant, and fully commissioned. It covers completion checks (fire checks, RAMS, waste removal, and site left clean), operational checks (system fill and pressure test, tightness test, hot water temperature, heating performance, and control verification), and resident handover steps (explain controls, leave manuals and instructions, set programmer to requirements, and collect satisfaction survey). It also includes commissioning documentation (Benchmark form, LGSR, CO and smoke detector tests with expiry dates), required installation photos (boiler, flue, condensate, thermostat, cylinder, radiators, filter, gas meter, and flue route), and a section to record any notable damage and notifications.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
