A practical Post-Installation Audit checklist designed for construction and property works. Capture site details and verify key elements such as doors and locking mechanisms, furniture fit, specified glazing, airbricks, sealing services, mortar repair, and application of water stop on exterior walls. Confirm installation and function of pumps and visible pipework, issue and explain puddle pump use to the owner or tenant, and record snags and resolutions for a compliant, watertight handover. Suitable for final checks by contractors or facilities teams and for documenting sign-off by a Water Tight representative.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
