A practical Post-Installation Audit checklist designed for construction and property works. Capture site details and verify key elements such as doors and locking mechanisms, furniture fit, specified glazing, airbricks, sealing services, mortar repair, and application of water stop on exterior walls. Confirm installation and function of pumps and visible pipework, issue and explain puddle pump use to the owner or tenant, and record snags and resolutions for a compliant, watertight handover. Suitable for final checks by contractors or facilities teams and for documenting sign-off by a Water Tight representative.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
